Changeset 3752018
- Timestamp:
- 10/17/2026 02:33:09 PM (3 weeks ago)
- Location:
- nepali-date-converter
- Files:
-
- 34 added
- 3 edited
-
tags/3.0.6 (added)
-
tags/3.0.6/inc (added)
-
tags/3.0.6/inc/class (added)
-
tags/3.0.6/inc/class/index.php (added)
-
tags/3.0.6/inc/class/ndc-frontend.php (added)
-
tags/3.0.6/inc/class/ndc-post-date.php (added)
-
tags/3.0.6/inc/frameworks (added)
-
tags/3.0.6/inc/frameworks/nepali-calendar (added)
-
tags/3.0.6/inc/frameworks/nepali-calendar/index.php (added)
-
tags/3.0.6/inc/frameworks/nepali-calendar/nepali-calendar.php (added)
-
tags/3.0.6/inc/functions (added)
-
tags/3.0.6/inc/functions/functions.php (added)
-
tags/3.0.6/inc/functions/index.php (added)
-
tags/3.0.6/inc/hooks (added)
-
tags/3.0.6/inc/hooks/enqueue-scripts.php (added)
-
tags/3.0.6/inc/hooks/index.php (added)
-
tags/3.0.6/inc/hooks/wp-ajax.php (added)
-
tags/3.0.6/inc/hooks/wp-footer.php (added)
-
tags/3.0.6/inc/index.php (added)
-
tags/3.0.6/inc/init.php (added)
-
tags/3.0.6/inc/shortcode (added)
-
tags/3.0.6/inc/shortcode/index.php (added)
-
tags/3.0.6/inc/shortcode/shortcode-nepali-date-converter.php (added)
-
tags/3.0.6/inc/shortcode/shortcode-today-date.php (added)
-
tags/3.0.6/inc/widgets (added)
-
tags/3.0.6/inc/widgets/index.php (added)
-
tags/3.0.6/inc/widgets/widget-nepali-date-converter.php (added)
-
tags/3.0.6/inc/widgets/widget-today-date.php (added)
-
tags/3.0.6/index.php (added)
-
tags/3.0.6/languages (added)
-
tags/3.0.6/languages/index.php (added)
-
tags/3.0.6/languages/nepali-date-converter.pot (added)
-
tags/3.0.6/nepali-date-converter.php (added)
-
tags/3.0.6/readme.txt (added)
-
trunk/inc/frameworks/nepali-calendar/nepali-calendar.php (modified) (2 diffs)
-
trunk/nepali-date-converter.php (modified) (2 diffs)
-
trunk/readme.txt (modified) (2 diffs)
Legend:
- Unmodified
- Added
- Removed
-
nepali-date-converter/trunk/inc/frameworks/nepali-calendar/nepali-calendar.php
r3295560 r3752018 133 133 81 => array( 2081, 31, 32, 31, 32, 31, 30, 30, 30, 29, 30, 29, 31 ), 134 134 82 => array( 2082, 31, 31, 32, 31, 31, 31, 30, 29, 30, 29, 30, 30 ), 135 83 => array( 2083, 31, 31, 32, 31, 31, 3 0, 30, 30, 29, 30, 30, 30 ),135 83 => array( 2083, 31, 31, 32, 31, 31, 31, 30, 30, 29, 30, 30, 30 ), 136 136 84 => array( 2084, 31, 31, 32, 31, 31, 30, 30, 30, 29, 30, 30, 30 ), 137 137 85 => array( 2085, 31, 32, 31, 32, 30, 31, 30, 30, 29, 30, 30, 30 ), … … 146 146 94 => array( 2094, 31, 31, 32, 31, 31, 30, 30, 30, 29, 30, 30, 30 ), 147 147 95 => array( 2095, 31, 31, 32, 31, 31, 31, 30, 29, 30, 30, 30, 30 ), 148 96 => array( 2096, 30, 31, 32, 32, 3 1, 30, 30, 29, 30, 29, 30, 30 ),148 96 => array( 2096, 30, 31, 32, 32, 32, 30, 30, 29, 30, 29, 30, 30 ), 149 149 97 => array( 2097, 31, 32, 31, 32, 31, 30, 30, 30, 29, 30, 30, 30 ), 150 150 98 => array( 2098, 31, 31, 32, 31, 31, 31, 29, 30, 29, 30, 29, 31 ), -
nepali-date-converter/trunk/nepali-date-converter.php
r3295560 r3752018 4 4 Plugin URI: https://www.addonspress.com/wordpress-plugins/nepali-date-converter/ 5 5 Description: Convert English to Nepali Date and Vice Versa and Post Date to Nepali Date. 6 Version: 3.0. 56 Version: 3.0.6 7 7 Author: addonspress 8 8 Author URI: https://www.addonspress.com/ … … 17 17 } 18 18 /*Define Constants for this plugin*/ 19 define( 'NEPALI_DATE_CONVERTER_VERSION', '3.0. 5' );19 define( 'NEPALI_DATE_CONVERTER_VERSION', '3.0.6' ); 20 20 define( 'NEPALI_DATE_CONVERTER_PATH', plugin_dir_path( __FILE__ ) ); 21 21 define( 'NEPALI_DATE_CONVERTER_URL', plugin_dir_url( __FILE__ ) ); -
nepali-date-converter/trunk/readme.txt
r3295560 r3752018 4 4 Tags: Nepali post date, Nepali date converter, today Nepali date, English to Nepali date converter, Nepali to English date converter 5 5 Requires at least: 4.9 6 Tested up to: 6.86 Tested up to: 7.1 7 7 Requires PHP: 7.2 8 Stable tag: 3.0. 58 Stable tag: 3.0.6 9 9 License: GPLv2 or later 10 10 License URI: http://www.gnu.org/licenses/gpl-2.0.html … … 122 122 == Changelog == 123 123 124 = 3.0.6 - 2026-10-17 = 125 * Fixed: Corrected the number of days for Ashoj in BS 2083 (30 to 31). 126 * Fixed: Corrected the number of days for Shrawan in BS 2096 (31 to 32). 127 * Updated: Tested up to WordPress 7.1. 128 124 129 = 3.0.5 = 125 130 * Fixed: Corrected the number of days for months in BS 2082.
Note:
See TracChangeset
for help on using the changeset viewer.
![(please configure the [header_logo] section in trac.ini)](/chrome/site/your_project_logo.png)